FCC Calvert Facility

FJD Construction is providing rail and civil engineering expertise to the client, FCC Environment, as HS2 affected its Calvert Landfill site.

The closure of the existing railhead and construction of a new £100m sidings facility requires technical input into specifications and track layouts to enable HS2 contractor Eiffage Kier to deliver the right solution. FJD Construction, PYCC and FJD Consulting have combined to carry out feasibility options for the temporary relocation of train operations from Calvert during the construction period, reviewing numerous sites around the UK that have rail head and FCC landfill sites in close proximity.